Tag: checklist

notes and things

Shop notes

Marla needs an ignition switch since I drilled thru the old one. I think we need to prioritize the bricklin since it’s closest to “done”. Needs: Windows glued back on track Door actuators (preferably pneumatic) D rings Seats Pump reconnected Gas tank reinstalled Change all fluids

Teen Wolves Checklist 1-13-19

intros/ends/transitions get drum scenes down to 2-4. Too much time changing scenes for each song vocal rehearsal needs to be scheduled speak with phil about choreography build show file for kayla, fixtures, recordings determine costumes open bank account business cards wire lights artnet nodes test/installation